Guide · Energy, Mining and Environment
Power and Renewables
Power and renewables projects in Canada depend on provincial market design, long-term contracts and federal climate and tax rules. This guide explains the Alberta and Ontario markets, Crown utility procurements, PPAs, the Clean Electricity Regulations, clean technology and clean electricity tax credits, storage and grid connection, nuclear and SMRs, and Indigenous partnerships.
Key takeaways
- Electricity is mostly provincial: Alberta and Ontario run markets, other provinces rely on Crown utilities.
- The Clean Electricity Regulations apply to fossil units of 25 MW or more, with limits from 2035.
- Canada agreed in November 2025 to suspend the Clean Electricity Regulations in Alberta.
- Clean Technology ITC up to 30%; Clean Electricity ITC up to 15%, with labour conditions.
- Budget 2026 proposes extending both credits to property available for use before 2041.
Power and renewables in Canada: the short version
Electricity regulation in Canada is mostly provincial, and each province has built a different system. Alberta runs an energy-only competitive wholesale market that is being restructured. Ontario combines a wholesale market operated by the Independent Electricity System Operator (IESO) with long-term procurement contracts and regulated rates. Quebec, British Columbia, Manitoba and several Atlantic provinces rely on vertically integrated Crown utilities that procure new supply through calls for tenders. For developers of power and renewables projects, the province determines who buys the power, on what terms, and how the project connects to the grid.

Federal law sets the outer frame. The Clean Electricity Regulations limit emissions from fossil-fuelled generation from 2035, the Canadian Nuclear Safety Commission (CNSC) licenses nuclear facilities, the Canada Energy Regulator (CER) regulates international power lines, and federal investment tax credits are a major source of value for clean energy projects. This page explains how these layers fit together for developers, investors, utilities and large energy users.
| Measure | Key terms | Status (November 2026) |
|---|---|---|
| Clean Electricity Regulations (SOR/2024-263) | Emission limits for fossil-fuel units of at least 25 MW connected to an electricity system | Registered December 2024; main emission limits come into force 1 January 2035; suspended in Alberta under the 2025 Canada–Alberta memorandum |
| Clean Technology investment tax credit | Up to 30%, refundable; 15% for property available for use in 2034 | In force; Budget 2026 proposes extending to property available for use before 2041 |
| Clean Electricity investment tax credit | Up to 15%, with labour conditions for the full rate | In force; Budget 2026 proposes extension and coverage of high-voltage intra-provincial transmission |
| Nuclear licensing | CNSC licences under the Nuclear Safety and Control Act | Applies to large reactors and small modular reactors |
Electricity markets in Alberta and Ontario
Alberta's market has been the main destination for merchant renewables and corporate power purchase agreements in Canada, because generators can sell into the wholesale pool and contract directly with buyers. The province has been restructuring the market design, including changes to how prices are formed, how transmission costs are allocated and how new supply is encouraged, with implementation phased over several years. Investors in Alberta power and renewables should follow the market rules and Alberta Utilities Commission (AUC) decisions closely, because market design changes directly affect revenue.
Ontario relies on the IESO to plan the system and procure resources through competitive processes for new capacity, energy and storage, alongside contracts held by Ontario Power Generation and regulated rates set by the Ontario Energy Board (OEB). Procurements typically specify eligibility, Indigenous participation requirements, municipal support resolutions for certain projects and contract terms that run for many years. Winning a contract depends as much on meeting these procedural requirements as on price.
Crown utility provinces
In Quebec, Hydro-Québec procures new wind and other supply through calls for tenders and partnership models, often with Indigenous and municipal partners. In British Columbia, BC Hydro has run calls for power for new renewable energy, also with Indigenous equity requirements. In these provinces, the counterparty is a single public utility, so the call documents and the standard power purchase agreement largely determine the risk allocation. Bidders should read the evaluation criteria closely, because community and Indigenous participation can carry significant weight.
Power purchase agreements
Power purchase agreements (PPAs) are the commercial core of most power and renewables projects. Utility PPAs from procurement processes are typically long-term, standard-form contracts with limited room for negotiation. Corporate PPAs, where a company buys power or environmental attributes directly from a project, are more bespoke. In Alberta, physical and virtual (financial) PPAs are both used; elsewhere, regulatory structures often limit physical sales to end users, so virtual PPAs and renewable energy certificate purchases are more common.
Clauses that matter
- Price and settlement: fixed price, indexation, and for virtual PPAs, the settlement mechanism against the market price.
- Volume and shape risk: who bears the risk that generation does not match demand or that prices are low when output is high.
- Environmental attributes: ownership and registration of renewable energy certificates and carbon offsets or credits.
- Change in law: how changes to market rules, carbon pricing or tax credits affect the contract.
- Credit support: letters of credit, parent guarantees and termination payments.
- Accounting: whether a virtual PPA must be treated as a derivative, which affects the buyer's financial statements.
Clean Electricity Regulations and carbon pricing
The Clean Electricity Regulations apply to units that have a generation capacity of at least 25 MW, generate electricity using fossil fuel and are connected to an electricity system. The core emission limit provisions come into force on 1 January 2035, with later dates for units that reach the end of a prescribed life, and with flexibility mechanisms for peaking and backup units. Smaller units commissioned on or after 1 January 2025 can be caught if they are part of a facility whose aggregate capacity meets the threshold.
Under the Canada–Alberta memorandum of understanding of 27 November 2025, Canada committed to suspend the Clean Electricity Regulations in Alberta immediately, pending a carbon pricing agreement, and later to place them in abeyance. That memorandum, and the implementation agreement of 15 May 2026, shift the emphasis in Alberta to industrial carbon pricing. For other provinces the regulations continue to apply on their terms. Gas-fired generation remains subject to provincial and federal carbon pricing for large emitters, and the federal benchmark price is CAD 110 per tonne in 2026, rising to CAD 170 in 2030.
Investment tax credits for power and renewables
Federal investment tax credits are central to power and renewables economics. The Clean Technology investment tax credit is refundable and is available at up to 30% for eligible property, including solar, wind, storage and certain small modular reactors, available for use after 28 March 2023 and before 2035, with the rate reduced to 15% in 2034. The Clean Electricity investment tax credit, at up to 15%, is available to a broader range of entities, including certain Crown corporations and pension investment corporations, for eligible generation, storage and interprovincial transmission.
The full rates require compliance with prevailing wage and apprenticeship labour conditions. Budget 2026, tabled on 5 November 2026, proposes extending both credits to property available for use before 2041 and adding high-voltage intra-provincial transmission. Those proposals require legislation, so projects reaching commercial operation after 2034 should model both scenarios. Tax credit eligibility should be addressed in financing documents and equity agreements, with clear allocation of the risk of recapture or denial.
Document labour condition compliance from the start of construction. Prevailing wage and apprenticeship requirements apply to covered workers on site, and missing records can reduce the credit rate significantly. Build compliance obligations and audit rights into the EPC contract and subcontracts.
Storage, transmission and grid connection
Battery storage is now procured directly in several provinces and participates in wholesale markets where rules allow. Legal questions include whether storage is treated as generation, load or both, how it pays transmission charges and how it earns revenue across energy, capacity and ancillary services. Transmission development is regulated by provincial commissions, and interprovincial and international lines involve the CER. Interties between provinces, including between Alberta and British Columbia, are a recurring policy theme.
Grid connection is often the critical path. Connection processes involve system impact studies, facility studies, cost responsibility for upgrades and milestone requirements. Large loads such as data centres are now competing with generation for connection capacity, and provinces are developing new rules for large loads. Alberta committed in the 2025 memorandum to implement a policy framework for large data centre investments by 1 July 2026. Developers should secure connection rights early and understand when deposits become non-refundable. Where a connection queue is reformed, transition rules decide which projects keep their place, so participants should comment on proposed changes and document their milestones carefully.
Distributed energy and behind-the-meter projects
Not every project sells into the grid. Rooftop solar, on-site cogeneration, microgrids and behind-the-meter storage are governed by provincial rules on net metering, self-generation and the sale of electricity to third parties. In some provinces, only licensed retailers or the utility may sell electricity to a customer, which can limit third-party ownership models such as solar leases. Commercial and industrial users considering on-site generation should check these rules and the treatment of standby and transmission charges, which can change the economics significantly.
Land, permits and community approvals
A wind, solar or storage project needs secure land rights before anything else. Developers usually sign option agreements that convert into long-term leases or easements, registered on title, with landowners. These agreements should cover access, decommissioning and restoration, crop and livestock compensation, assignment to lenders and the treatment of mortgages already on title. On Crown land, provinces grant rights through dispositions under their public lands legislation.
Permitting varies by province. Alberta requires AUC approval for power plants and has introduced additional rules on agricultural land, viewscapes and reclamation security for renewable projects. Ontario requires a renewable energy approval or environmental permits depending on the technology and size, and IESO procurements have required municipal support resolutions for some projects. Quebec projects go through provincial environmental assessment and municipal processes. Federal approvals can be triggered by migratory birds, species at risk, fisheries and aviation safety. A permitting matrix prepared at the outset, and updated as the design changes, avoids costly surprises.
Hydro, offshore wind and interties
Large hydro remains the backbone of several provincial systems and raises long-standing questions about water rights, Indigenous agreements and export arrangements. Offshore wind is emerging in Atlantic Canada under expanded offshore regulatory regimes that now cover renewable energy, where the regulators and governments are developing the framework for issuing rights to offshore areas. Interties between provinces and with the United States are regulated provincially and, for international lines, by the CER, and they can open export markets for surplus clean power.
Nuclear and small modular reactors
Nuclear energy is under federal jurisdiction. The CNSC licenses each stage of a nuclear facility's life, from site preparation and construction to operation and decommissioning, under the Nuclear Safety and Control Act. Operators are subject to the Nuclear Liability and Compensation Act, which channels liability for nuclear incidents to the operator, and to federal requirements for managing nuclear waste. Ontario has advanced the first grid-scale small modular reactor project in Canada, and other provinces, including Saskatchewan, New Brunswick and Alberta, are evaluating SMRs. Alberta committed in the 2025 memorandum to work with Canada on a nuclear generation strategy by 1 January 2027.
For investors and suppliers, nuclear projects raise issues of export controls on technology, security clearances, Indigenous consultation on siting and waste, and long-term contracts for fuel and services. The Nuclear Waste Management Organization's deep geological repository was among the projects the government began the process of listing under the Building Canada Act in June 2026.
Indigenous partnerships in power projects
Indigenous equity ownership is now a standard feature of power and renewables projects in Canada. Many procurements score or require Indigenous participation, and loan guarantee programmes at the federal and provincial levels help communities finance equity stakes. Partnership agreements must address governance rights, cash distributions, construction risk, debt service, and buy-out and exit rights. The Crown's duty to consult applies to approvals for generation and transmission, and projects with community support move through approvals faster. Our Indigenous law and consultation page explains the framework.
Power and renewables transactions and financing
Power and renewables assets change hands frequently, through sales of single projects, portfolios and developer platforms. Due diligence focuses on PPAs and procurement contracts, land rights and municipal approvals, interconnection agreements, environmental permits, tax credit eligibility, Indigenous agreements and operating performance. Project financings rely on contracted revenue and robust security, and lenders scrutinize change-in-law protection and termination payments. Our project and infrastructure finance page covers financing structures, and our energy regulatory page explains regulatory approvals for transfers.
Foreign investors should also consider the Investment Canada Act, since utilities and critical energy infrastructure can attract national security attention, and the Competition Act where notification thresholds are met.
Disputes in power projects
Disputes in power and renewables often arise from construction delays and turbine or module supply problems, curtailment and grid outages, PPA price and settlement mechanics, and regulatory changes that alter project economics. Contracts should provide for expert determination of technical issues and clear rules on force majeure, change in law and curtailment compensation. Regulatory decisions can be appealed or reviewed only on narrow grounds and within short deadlines, so developers need to act quickly when a decision affects a project.
How TRW & Co helps
We advise developers, utilities, investors, lenders, large energy users and Indigenous partners on power and renewables in Canada. Our work covers procurement bids, PPAs and virtual PPAs, tax credit structuring, project and platform acquisitions, project finance, interconnection and regulatory approvals, nuclear and SMR contracting, and Indigenous equity partnerships. We coordinate with counsel licensed in the relevant province and with technical and tax advisers where a step requires it. See also our energy, mining and environment overview and our corporate PPAs insight. This page is general information, not legal advice. To discuss a project, contact us.
Frequently asked questions
Can a company buy renewable power directly from a project in Canada?
In Alberta, companies can sign physical or virtual power purchase agreements with generators because of the competitive market. In most other provinces, physical sales to end users are restricted, so companies use virtual PPAs, renewable energy certificates or utility green programmes. The structure depends on provincial law.
Do the Clean Electricity Regulations apply to my gas plant?
They apply to fossil-fuel units with at least 25 MW of capacity connected to an electricity system, and to some smaller units at larger facilities commissioned from 2025. The main emission limits apply from 1 January 2035. Canada committed in November 2025 to suspend the regulations in Alberta pending a carbon pricing agreement.
What tax credits are available for renewable projects?
The Clean Technology investment tax credit is available at up to 30% for eligible property such as solar, wind and storage, and the Clean Electricity credit at up to 15% for a wider range of entities. Full rates require meeting prevailing wage and apprenticeship conditions. Budget 2026 proposes extending both credits.
Who regulates small modular reactors?
The Canadian Nuclear Safety Commission licenses nuclear facilities, including small modular reactors, under the Nuclear Safety and Control Act. Provinces decide whether and how to procure nuclear generation, and operators are subject to federal nuclear liability and waste management rules.
Why is grid connection so important for new projects?
Connection studies, upgrade costs and capacity limits often determine whether a project can proceed and when. Large loads such as data centres now compete with generators for capacity, and provinces are revising their connection rules. Securing a connection position early and understanding deposit and milestone requirements is essential.
Sources
General information only, not legal advice. References to statutes, courts and authorities describe published law and practice at the date shown.