Skip to content
Capital Markets & Securities

Mining Disclosure Rules Under NI 43-101

Canada's mining disclosure rules in NI 43-101 govern every technical statement a reporting issuer makes about a mineral project. This note explains qualified persons, resource categories, technical report triggers and the 45-day deadline, the deficiencies regulators see most, and the CSA's 2025 proposal to replace the instrument.

Geologist logging drill core as part of a technical report under Canada's mining disclosure rules

Key takeaways

  • Technical disclosure on a material property must be prepared or approved by a qualified person.
  • A QP needs a relevant degree, five years' experience and good standing with a professional body.
  • First-time resources, reserves or PEA results trigger a technical report, generally within 45 days.
  • Inferred resources cannot be added to other categories; PEAs need equal-prominence cautionary language.
  • The CSA proposed repealing and replacing NI 43-101 in June 2025; comments closed 10 October 2025.

What Canada's mining disclosure rules require

Canada's mining disclosure rules are set out in National Instrument 43-101 Standards of Disclosure for Mineral Projects (NI 43-101), its Companion Policy and Form 43-101F1 Technical Report. They apply to every reporting issuer in Canada that discloses scientific or technical information about a mineral project, whether in a prospectus, a news release, a website, an investor presentation or a social media post. The core idea is simple: technical disclosure about a project on a property material to the issuer must be prepared by, or approved by, a qualified person, and certain disclosure must be backed by a technical report filed on SEDAR+.

Geologist logging drill core as part of a technical report under Canada's mining disclosure rules
Under NI 43-101, technical statements about a mineral project must be backed by a qualified person and, in many cases, a filed technical report.

Because so many of the world's exploration and mining companies list on the TSX and TSX Venture Exchange, these mining disclosure rules shape how projects in Canada, Latin America, Africa and Australia are described to investors. They also matter to private companies preparing for an initial public offering, a reverse takeover or a cross-listing, since a compliant technical report is usually a gating item.

The rules are under review. In June 2025 the Canadian Securities Administrators (CSA) proposed repealing and replacing NI 43-101 and Form 43-101F1 with a streamlined instrument and form, with comments due by 10 October 2025. This note describes the instrument in force and flags the main proposals; issuers should check whether final rules have since been published before relying on the details.

Qualified persons: the gatekeepers

The qualified person (QP) is central to NI 43-101. The instrument defines a QP as an individual who:

  • is an engineer or geoscientist with a university degree, or equivalent accreditation, in an area of geoscience or engineering relating to mineral exploration or mining;
  • has at least five years of experience in mineral exploration, mine development or operation, or mineral project assessment, relevant to that degree or area of practice;
  • has experience relevant to the subject matter of the mineral project and the technical report; and
  • is in good standing with a professional association recognized for this purpose.

Section 3.1 requires all written disclosure of scientific or technical information about a material property to name the QP who prepared or approved it, and to state the relationship between the QP and the issuer. Some technical reports must be prepared by an independent QP, including those supporting a first-time disclosure of resources or reserves by a non-producing issuer or a long form prospectus. Producing issuers whose securities trade on a specified exchange benefit from narrower independence requirements.

In practice, regulators expect the QP to have genuinely reviewed the information, not to have rubber-stamped a marketing draft. The QP should see the final text of a news release, including headline numbers, before it goes out.

Resource and reserve categories under the mining disclosure rules

NI 43-101 requires issuers to use the categories in the CIM Definition Standards for Mineral Resources and Mineral Reserves, adopted by the Canadian Institute of Mining, Metallurgy and Petroleum. Section 2.2 sets four mandatory disclosure conditions: use only the prescribed categories; report each category separately and state whether reserves are included in resources; never add inferred resources to other categories; and state grade or quality and quantity for each category when contained metal is disclosed.

CategoryLevel of confidenceDisclosure point
Inferred mineral resourceLowest; limited samplingCannot be added to other categories; generally excluded from economic analysis except in a compliant preliminary economic assessment
Indicated mineral resourceReasonable confidence in geology and gradeMay be converted to probable reserves with modifying factors
Measured mineral resourceHighest resource confidenceMay be converted to proven or probable reserves
Probable mineral reserveEconomically mineable part of indicated (or measured) resourcesRequires at least a pre-feasibility study
Proven mineral reserveEconomically mineable part of measured resourcesHighest confidence; requires at least a pre-feasibility study

Section 2.3 restricts disclosure of the quantity, grade or metal content of a deposit that has not been categorized as a resource or reserve, and of economic analysis that includes inferred resources. There are two important exceptions. An issuer may disclose an exploration target expressed as ranges if it states, with equal prominence, that the target is conceptual and that there has been insufficient exploration to define a mineral resource. And it may disclose a preliminary economic assessment (PEA) that includes inferred resources, if the cautionary language required by s. 2.3(3) is given with equal prominence.

When a technical report must be filed

Section 4.2 lists the documents that trigger a technical report for a material property. They include a preliminary long form prospectus, an annual information form, an information or proxy circular for certain transactions such as a reverse takeover, a take-over bid circular that discloses technical information about the offeror's property, and written disclosure (including a news release) of:

  • mineral resources, mineral reserves or PEA results for the first time;
  • a change in resources, reserves or PEA results that constitutes a material change for the issuer.

For disclosure in a news release or similar document, the technical report is generally due no later than 45 days after the disclosure. If the disclosure also appears in a preliminary short form prospectus or a directors' circular, earlier deadlines apply. When the report is filed, the issuer must issue a news release reconciling any material differences between the report and its earlier disclosure. Reports must follow Form 43-101F1, which sets out required items from property description and geology to mining methods, capital and operating costs and economic analysis.

Practical point

The 45-day clock starts with the first public disclosure, not the board approval of the study. Plan the technical report and the news release together, have the QP approve the release text, and make sure the headline numbers in the release match the report exactly. Reconciling differences after the fact is a common source of regulator comment letters.

Common deficiencies regulators find

CSA staff, the British Columbia Securities Commission (BCSC) and the other regulators regularly review mining issuers' disclosure, and the BCSC publishes mining disclosure guidance for issuers. Recurring problems include:

  1. Missing or vague QP attribution on websites, presentations and social media.
  2. Historical estimates presented as current without the cautionary disclosure the instrument requires.
  3. Economic analysis based on inferred resources outside a compliant PEA, or PEA results presented without equal-prominence cautionary language.
  4. Metal equivalent grades without the individual grades, prices and recovery assumptions used.
  5. Selective drill results, such as highlighting best intercepts without true widths, context or the full data set.
  6. Late technical reports, or reports that do not support the numbers previously released.
  7. Adjacent property disclosure implying that results from a neighbour's property are indicative of the issuer's own.

Consequences range from a request for corrective disclosure or a retraction to placement on a default list, a cease trade order or enforcement action. Misleading technical disclosure can also support secondary market civil liability claims, which is why the material change analysis in cases like Lundin Mining Corp. v. Markowich, 2025 SCC 39, matters for mining issuers.

Applying the mining disclosure rules to everyday communications

Most problems arise not in technical reports, which are prepared by specialists, but in the stream of routine communications around them. The mining disclosure rules apply equally to a quarterly MD&A, a conference slide deck, a podcast transcript posted on the issuer's website or a post by the chief executive on a professional network. A simple control framework helps:

  • One source of truth. Keep an approved "technical facts" sheet for each material property, signed off by the QP, and draw all public statements from it.
  • QP sign-off workflow. Route every release, deck and web update with technical content to the QP, and keep a record of the approval.
  • Standard cautionary language. Maintain approved wording for PEAs, exploration targets, historical estimates and metal equivalents, and use it with equal prominence.
  • Drill result templates. Present intercepts with true widths (or a statement that they are unknown), assay methods, quality assurance and quality control, and context about the full program.
  • Social media rules. Restrict who may post about projects and require that posts link to the full release rather than paraphrase it.

Historical estimates

Section 2.4 allows an issuer to disclose a historical estimate, made before it acquired the property, only with specific disclosure: the source and date, the relevance and reliability of the estimate, the categories used, the work needed to upgrade or verify it, and a statement that a QP has not done sufficient work to classify it as a current resource or reserve and that the issuer is not treating it as current. Omitting these elements is one of the most frequent findings in regulatory reviews.

The 2025 proposals to modernize the mining disclosure rules

The CSA's June 2025 notice describes the proposed package as modernizing and streamlining the regime while continuing to protect investors. Among the proposals described in the notice:

  • a new, streamlined NI 43-101, Form 43-101F1 and Companion Policy replacing the current versions;
  • removing the requirement for a royalty-only issuer to file a technical report, because its QP usually cannot access the owner's data or complete a personal inspection;
  • more attention to environmental and social matters and to relationships, engagement and agreements with Indigenous Peoples, rightsholders and communities, where material;
  • retaining the current personal inspection requirement, which the CSA describes as foundational to the QP's gatekeeper role.

Until any final rule is in force, the existing instrument governs. Issuers planning a technical report in 2026 should ask their QPs whether a report prepared now is likely to need updating under a new form, and should watch for transition provisions.

Illustration (hypothetical): a TSX Venture issuer completes a maiden resource estimate on its Ontario gold project. It announces the estimate by news release, naming the independent QP and including the categories, grades, cut-off grade and key assumptions. It files the technical report on SEDAR+ within 45 days and issues a short release confirming the filing. Six months later it releases a PEA based partly on inferred resources, with the cautionary statement given equal prominence in the release and on its website.

How TRW & Co helps with mining disclosure rules

We advise mining issuers, underwriters and investors on mining disclosure rules in Canada. That includes reviewing news releases, investor presentations and websites before publication, coordinating with qualified persons on technical report timing, preparing prospectus and RTO disclosure, and responding to regulator comment letters. We work with Canadian-licensed counsel where a filing or opinion requires it. Our mining and critical minerals and continuous disclosure practices cover related issues, and our notes on flow-through financings and timely disclosure of material changes explain adjacent rules. To discuss your disclosure, contact us. This note is general information, not legal advice.

Frequently asked questions

Who can be a qualified person under NI 43-101?

An engineer or geoscientist with a relevant degree or equivalent accreditation, at least five years of relevant experience in exploration, mine development or operation, or project assessment, experience relevant to the project and report, and good standing with a recognized professional association. Some reports must be prepared by an independent qualified person.

When must a technical report be filed after a news release?

If a news release discloses mineral resources, reserves or PEA results for the first time, or a material change in them, for a material property, the technical report is generally due within 45 days. Earlier deadlines apply if the disclosure is also in a preliminary short form prospectus or a directors' circular.

Can an issuer disclose economics based on inferred resources?

Only in a preliminary economic assessment that meets s. 2.3(3) of NI 43-101. The disclosure must state, with equal prominence, that the PEA is preliminary, includes inferred resources too speculative to be categorized as reserves, and may not be realized, and must explain the basis for the assessment.

Does NI 43-101 apply to websites and social media?

Yes. The instrument applies to all written disclosure of scientific or technical information by a reporting issuer, including websites, presentations and social media. Each must name the qualified person who prepared or approved the information and follow the category and cautionary language rules.

Is NI 43-101 being replaced?

The CSA proposed in June 2025 to repeal and replace NI 43-101, Form 43-101F1 and the Companion Policy with streamlined versions, with comments due 10 October 2025. The current instrument governs until any final rule comes into force, so issuers should check for a final notice and transition rules.

Sources

  1. NI 43-101 Standards of Disclosure for Mineral Projects (OSC unofficial consolidation)
  2. CSA Notice and Request for Comment: Proposed Repeal and Replacement of NI 43-101 (12 June 2025)
  3. BCSC: Mining disclosure resources
  4. BCSC: NI 43-101 topical issues and guidance

General information only, not legal advice. References to statutes, courts and authorities describe published law and practice at the date shown.